Resources

Useful whether or not you buy anything

Readiness checklists, benchmarks and an ROI model you can run yourself. If the answer is that your mill is not ready, we would rather you found out here.

  • 6 resources
  • No gating on the checklists
  • Written by engineers

Library

What is available

The mill readiness assessment

A 24-point checklist covering sensing, connectivity, data and change management before you attempt autonomy.

Guide

Request →

Right-first-time shade: an engineering account

How substrate state, water chemistry and exhaust control combine, and why static recipe cards cannot hold shade.

Whitepaper

Request →

Mill-edge reference architecture

Edge appliance, camera placement, network segmentation and OT security for a 400-machine mill.

Reference

Request →

Autonomy policy template

A starting policy set for approval gates, setpoint envelopes and revert conditions per workflow.

Template

Request →

Textile autonomy benchmark 2026

How we propose to baseline right-first-time, seconds, water and energy across mill archetypes, each mill against its own trailing year.

Benchmark

Request →

Re-dye cost model

Estimate the annual cost of your re-dye rate in dye, water, steam, machine hours and late shipments.

Calculator

Request →

Readiness

Is your mill ready for autonomy?

The five readiness gates, in the order they usually fail
GateWhat good looks likeCommon failure
SensingInline measurement at the stage you want to controlLab-only measurement, sampled hours later
ConnectivityMachine data reachable over OPC UA or vendor tagsControllers isolated with no export path
Data history12 months of lot outcomes with shade and defect recordsPaper records or a spreadsheet per shift
Process ownershipA named owner per setpoint who can grant autonomyNo one willing to authorise a change
Change managementOperators told what is happening and whyAutonomy introduced as a surveillance tool

Deployment

From first connector to bounded control, one phase at a time

No mill hands over a jet on day one. The path is deliberately slow at the start and faster once the numbers hold. Durations are quoted after the assessment, because they depend on how instrumented the mill already is.

  1. Phase 1

    Connect

    Mill survey, edge appliance install, connectors to machines, MES and meters. Telemetry starts flowing; nothing is controlled.

  2. Phase 2

    Observe

    Models run in shadow against live production. Predictions are scored against what the mill actually produced, on your data.

  3. Phase 3

    Assist

    The agent proposes; a human commits. Approval gates, setpoint envelopes and revert paths are agreed with the process owners.

  4. Phase 4

    Control

    Bounded auto-control on the setpoints you authorise, one at a time, with autonomy ceilings that you can lower at any moment.

Trust signals

What the runs actually produce

No customer results are published yet. These are platform facts and plan terms from our own documents. Outcomes will be measured against each mill’s own trailing twelve months, in shadow mode before anything is controlled.

9

Mill agents, one per stage, from spinning to release.

6

Products in the loop: Vireon, Spindra, Loomix, Shadeon, Doffex and Twinly.

3 to 5

Design partners we are onboarding first, one wedge workflow each.

$14k

Per line per month on the Line plan. Mill and Enterprise sit above it.

Items marked ASPIRATIONAL are design targets ahead of production validation.

The problem

Textiles clothe the world and still run on craft, spreadsheets and hope

Fabric is made at enormous scale and inspected at human speed. That gap is where the industry’s waste lives.

Making fabric means spinning fibre to a consistent count and twist, weaving or knitting to exact construction, dyeing and finishing to exact shade, fastness and hand, and inspecting for slubs, holes, streaks, stains, barré, skew and width faults, all to buyer spec, fully traceable.

It is unforgiving. A yarn drift, a loom fault, a dye-recipe error or a finishing defect turns into seconds, reprocessing, shade rejects and buyer chargebacks. Dyeing and finishing are craft-bound and enormously water- and energy-hungry. And the whole mill is paced by a colourist and operator workforce that is shrinking faster than it is being replaced.

Most mill managers run blind on real-time yarn quality, fabric defects, shade, chemistry, waste and roll genealogy. The work is high-volume, tolerance-bound, resource-intensive and rate-constrained, which is the exact profile autonomy is for.

Seconds

Found after the roll is made

Slubs, holes, streaks and shade misses are caught at the inspection table, not while the fabric is being made.

Re-dyes

Shade missed at drain

A standing recipe card against many greige suppliers and seasonal water. The miss is paid in water, steam and time.

Water and energy

Per kilogram, unmeasured

Most mills know the monthly bill and not the litres per kilogram per shade family.

Audits

Genealogy by hand

A roll’s history reconstructed from spreadsheets and paper lab dips every time a buyer asks.

And the constraint underneath

The craft is retiring

A senior colourist can look at a bath and know it is running hot. There are fewer of them every year, and no mill has found a way to hire the difference.

Agent graph

One run, ten steps, one human decision

This is the shape of a dye lot on Yarneon, shown as an illustrative scenario rather than a customer run. Ingest and simulation fan out, converge on a colourist approval gate, then dosing, verification, finishing, inspection and release. The accent traces the active path; every node opens in the inspector.

RUN-4471 10 steps · 1 approval gate · 1 recovered failure · illustrative scenario COMPLETE
ingest conformance twin simulate recipe dye + colour approve human gate dose bath control shade verify ΔE finish stenter inspect vision rework replan grade release

Scroll the graph sideways · or open the text equivalent below

SUCCEEDED APPROVAL FAILED RUNNING
Text equivalent, workflow steps, dependencies and status
Run RUN-4471 workflow graph, as a table
StepStageDepends on StatusDuration
ingestconformancenone SUCCEEDED0.8s
twinsimulateingest SUCCEEDED46s
recipedye + colouringest SUCCEEDED2.4s
approvehuman gatetwin, recipe APPROVAL4m 12s
dosebath controlapprove SUCCEEDED118m
shadeverify ΔEdose SUCCEEDED9.1s
finishstenterdose SUCCEEDED64m
inspectvisionshade, finish FAILED38m
reworkreplaninspect SUCCEEDED1.6s
gradereleaserework SUCCEEDED3.0s
  • Parallel branches2twin simulation and recipe prediction run together
  • Human gates1colourist approval, 15 minutes, attributed
  • Failures recovered1weft streak on roll 09, replanned in-run

Run timeline

RUN-4471 · Indigo poplin, 3,180 kg, due Thursday

The same scenario run as an ordered timeline: step, status, duration and the tool result behind it. Inspection failed on one roll, the run recovered, replanned the cut and still held the ship date.

RUN-4471 RUN COMPLETE Scenario mill · reactive exhaust jet dyeing · illustrative run, not a customer deployment

Goal: Dye lot DL-4471 · 3,180 kg · 40s combed cotton poplin · shade Indigo 19-4028 TCX · ΔE ≤ 0.8 · due Thu 06:00

  1. 01 ingest.lot_state SUCCEEDED 0.8s

    Pulls greige genealogy for 14 rolls: yarn lots, loom, greige GSM 138, absorbency and residual size from the prep line.

    Agent, input and output
    agent   Quality-and-Conformance
    result  ← 14 rolls · 3,180 kg · mean GSM 138.2 (σ 1.1) · prep OK
  2. 02 twin.simulate_lot SUCCEEDED 46s

    Omniverse fabric-line twin simulates the exhaust curve, machine loading and takt for three candidate recipes before a drop of dye is used.

    Agent, input and output
    agent   Yield-and-Takt
    result  ← 3 candidates scored · best predicted ΔE 0.52 · 118 min cycle
  3. 03 dye.predict_recipe SUCCEEDED 2.4s

    Spectral recipe model proposes a 3-dye combination against the buyer standard, corrected for this substrate’s absorbency and the current water hardness.

    Agent, input and output
    agent   Dye-and-Color
    result  ← 2.14% Navy RGB · 0.61% Blue BRF · 0.08% Black B · salt 62 g/L
  4. 04 human.approve_recipe APPROVAL 4m 12s

    Recipe deviates >5% from the standing card, so autonomy is capped: the colourist approves, rejects or edits before any dosing. Guardrail policy MILL-02/DYE-APPROVAL.

    Agent, input and output
    agent   Dye-and-Color
    result  → awaiting colourist · approved on shift 04:18
  5. 05 dye.control_bath SUCCEEDED 118m

    Closed-loop dosing and ramp control against live bath spectrophotometry; two mid-cycle corrections applied when exhaustion ran 4% ahead of model.

    Agent, input and output
    agent   Dye-and-Color
    result  ← exhaust 96.4% · 2 corrections · bath ΔE 0.41 at drain
  6. 06 shade.verify_lot SUCCEEDED 9.1s

    Per-roll spectral read against Indigo 19-4028 TCX under D65/TL84/A; metamerism scored and rolls sorted into shade bands.

    Agent, input and output
    agent   Shade-and-Quality
    result  ← mean ΔE 0.58 · 13 rolls band A · 1 roll band B
  7. 07 finish.control_stenter SUCCEEDED 64m

    Stenter chemistry, overfeed and curing profile set to hold hand, 148 cm width and residual shrinkage under 3%.

    Agent, input and output
    agent   Finish-and-Hand
    result  ← width 148.3 cm · shrink 2.1% warp / 1.4% weft
  8. 08 inspect.scan_rolls FAILED 38m

    In-line vision flags a recurring 6 cm weft streak on roll 09 between 412 m and 445 m, traced to a stenter pin-chain slip, not a dye fault.

    Agent, input and output
    agent   Defect-and-Inspect
    result  ← 1 defect cluster · roll 09 · 33 m affected · class WEFT_STREAK
  9. 09 plan.rework_route SUCCEEDED 1.6s

    cuOpt re-plans the cut and rework route: 33 m diverted to seconds, remaining 14,890 m re-sequenced so the buyer’s Thursday ship date still holds.

    Agent, input and output
    agent   Yield-and-Takt
    result  ← 33 m to seconds (0.22%) · ship date held
  10. 10 quality.grade_and_release SUCCEEDED 3.0s

    Four-point grading, roll genealogy and the conformance packet (AATCC 61, ISO 105-C06, ZDHC MRSL declaration) are assembled and released to the buyer portal.

    Agent, input and output
    agent   Quality-and-Conformance
    result  ← 13 rolls Grade A · 1 roll Grade B · packet signed
RUN OUTCOME

Lot released first time, on shade, on date.

Result of run RUN-4471
MeasureValueContext
Final mean ΔE0.58against a 0.80 tolerance
Re-dyes avoided1the standing card would have missed shade
Seconds0.22%versus the scenario mill baseline of 1.9%
Water used46 L/kgversus 59 L/kg on the scenario recipe card
Human decisions1the recipe approval gate

Why this matters

A mill does not fail on the good lots. It fails on the lot where the substrate drifted, the recipe card was wrong, and nobody found out until the buyer opened the carton. Yarneon makes that lot legible while it is still in the machine.

Use cases

What mills point Yarneon at first

Every deployment starts with one wedge workflow that pays for itself, then expands along the line.

Hold shade on the first dyeing

Substrate-aware recipe prediction plus closed-loop exhaust control, with the colourist approving only what deviates.

Dye-and-Color

See the agent →

Catch defects at the machine

Line-scan and NIR vision classify slubs, holes, streaks, stains, floats, barré and skew at full line speed, mapped to roll position.

Defect-and-Inspect

See the agent →

Stop end-breaks before they cascade

Evenness and draft telemetry predict end-break clusters on ring frames and adjust before the frame sheds packages.

Spin-and-Yarn

See the agent →

Keep construction on spec

Warp and weft tension control across air-jet, rapier and circular-knit machines holds pick and course density inside tolerance.

Weave-and-Knit

See the agent →

Hit hand, width and shrinkage

Stenter chemistry, overfeed and curing profiles tuned per construction so finished goods pass dimensional-stability tests.

Finish-and-Hand

See the agent →

Band rolls by shade before cutting

Spectral scoring sorts rolls into shade bands so no garment is cut from two shades.

Shade-and-Quality

See the agent →

Sequence dye lots for water and takt

Shade-family aware sequencing under delivery and machine constraints cuts changeovers, water and steam.

Yield-and-Takt

See the agent →

Automate doffing and roll transport

Vision-guided manipulators and AMRs take the lifting out of the job that mills cannot staff.

Robot-and-Handling

See the agent →

Produce the buyer packet automatically

Roll genealogy, test methods and chemistry declarations assembled and signed at release.

Quality-and-Conformance

See the agent →

Design-partner programme

What a design partnership involves

Three to five mills, one wedge workflow each, shadow mode first. The sequence comes from our MVP plan and does not change for anyone.

  1. Phase 1

    Instrument

    The wedge workflow is connected in shadow mode and the baseline for seconds, re-dyes and waste is measured from the mill’s own data.

  2. Phase 2

    Assist

    The agent recommends yarn, construction and recipe moves and predicts defects and shade. An engineer approves each one, and accuracy is scored in the open.

  3. Phase 3

    Graduate

    Low-risk inspection, dye and finishing loops move to bounded auto-control one setpoint at a time. Exceptions escalate to a named person.

  4. Phase 4

    Expand

    Adjacent modules are added within the same mill once the wedge holds its numbers. Publication of results is the mill’s decision.

Guardrails

An agent earns the right to touch a machine

Nothing here is a global "AI on" switch. Autonomy is granted per setpoint, bounded by policy, reversible by any operator and logged permanently.

Graduated autonomy
Every workflow moves observe → assist → bounded auto-control. Autonomy ceilings are per-setpoint policy, not a global switch.
Human-in-the-loop gates
Approval gates fire on deviation thresholds, new substrates, or any action outside the authorised envelope. Approvals are attributed and time-stamped.
Reversibility
Every control action ships with a revert path and a last-known-good setpoint. Operators can take manual control at any moment, from the HMI or the panel.
Immutable audit log
Assurance-grade, append-only record of every observation, decision, tool call, approval and actuation, exportable for buyer and regulatory audit.
Tenant isolation
Recipes, construction libraries and roll data are isolated per tenant. No cross-tenant training. Permission-aware retrieval with enforced citations.
Sandboxed tools
Agents call machines through a typed, scoped tool layer with rate and range limits. There is no path from a model output to an unbounded PLC write.

Pricing

Land on one line. Expand across the mill.

Priced per line, per mill or per group, with outcome-based components on the workflows where the value is measurable.

Line

$14,000 per spinning, weaving/knitting or dye line, per month

Mills validating ROI on a single wedge workflow.

  • One agent workflow on one line, yarn/fabric control, dyeing, or inspection
  • Mill-edge inference appliance and connector for that line
  • Run timeline, tool-call log and immutable audit trail
  • Assist mode with human approval on every control action
  • Standard email and shared-channel support, 1 business-day response
Start with Line

Enterprise

Custom typical land $650k–$8.5M ACV

Integrated textile groups standardising on Yarneon.

  • Multi-site deployment with group-level benchmarking
  • Custom fibre, construction and shade models trained on your archive
  • On-prem or private-VPC deployment via NVIDIA AI Enterprise
  • SSO, SCIM, RBAC, data residency and signed SLAs
  • Outcome-based commercial components on yield, seconds, re-dyes and utilities
  • Dedicated solutions team and 24×7 support
Talk to sales

Annual prepay saves 15 to 20% depending on term. Full detail, including outcome-based terms, on the pricing page.

Questions

What mills ask before they let an agent near a jet

Both, in that order. Every workflow starts in observe mode, graduates to assist (the agent proposes, a human commits), and only then to bounded auto-control on the specific setpoints you authorise. Autonomy ceilings, approval gates and spend limits are policy objects you own, and every action is reversible and logged.

Run the readiness assessment with us

Twenty-four questions, one hour, and an honest answer about whether autonomy is the next thing you should buy.

Book a mill assessment